Feature

Field Math You Can Check, Not AI Guesswork

32 built-in calculators — wire sizing, leak rate, pay applications, deposits, crew-hour estimates and more — run on measured inputs, your own history, and bundled tables. Every result shows its work before anyone relies on it.

Trust pattern

Inputs visible

Measured fields and accumulator rows sit beside the result.

Math shown

The formula, table line, assumptions, confidence tier, and the liability note always stays visible.

Saved to job

Accepted numbers become calculation records, not loose calculator screenshots.