AI and BYO-AI policy

AI drafts; the human owns.

FieldOS works with zero AI. Capture, proof, memory, and every calculator run without a model. AI is a fenced drafting and translation convenience plus a clean export path to your own AI account.

(1) FieldOS's own cloud AI

Drafting, summarizing, translating the user's own text, explicit and rate-limited, with a check-before-send step.

(2) the BYO-AI export package

A structured export of the account's own data that the user can take to their own ChatGPT/Gemini/Claude account.

You decide; FieldOS remembers, does the math, and proves.

Principles

AI is never in the capture or save path.

Bound Camera, Offline Save Vault, and local-save trust never depend on a model.

AI is never in the calculation path.

Every built-in calculator is plain arithmetic over built-in tables. AI may summarize around accepted outputs; it never produces or modifies a computed value.

AI is user-triggered, never automatic.

Nothing goes to any model without an explicit tap on a clearly labeled action.

AI drafts; the human owns.

Every output is a draft behind a check-before-send step. AI text never auto-saves into a record and never auto-sends to a customer.

AI never authors safety or compliance language.

No generated safety advice, hazard text, PPE guidance, or compliance statements.

Operating rules:

Explicit.

Each action is a labeled button, and first use says text is being sent to FieldOS's AI service.

Rate-limited.

When the daily AI-draft limit is reached, write it yourself or use the bring-your-own-AI export. Capture and calculators are never metered.

Check before sending.

AI output renders in an editor with Draft — read and edit before you use it.

Content-minimized.

Photos, customer names, addresses, and gate codes are excluded from AI payloads by default. Gate codes are excluded always.

What FieldOS's AI never does

Never certifies.

No AI statement about compliance, code, safety, legality, or correctness of work.

Never auto-sends.

No AI-generated message leaves the account without the user reading and tapping send.

Never trains on private data.

Customer photos, notes, addresses, voice, and account content are never used to train or fine-tune any model.

Never sees what it doesn't need.

No account-wide scanning, no always-on assistant, no background enrichment of records.

Never touches the record silently.

AI cannot create, edit, or delete a record; it can only propose text the user explicitly accepts.

The BYO-AI export package

What it is:

A structured backup file (or ZIP for larger scopes) of the account's own data at the scope the user picks.

What it deliberately is:

Text and structure. Photos are referenced by filename/label by default; image files require an explicit ZIP option.

Cost posture:

Generated as a local file, unlimited, free on every plan.

What it is not:

A live integration. FieldOS does not call OpenAI/Google/Anthropic with your data and holds no API relationship on your behalf at launch.

Handoff rules

Their account, their responsibility.

The data goes to that provider under that provider's terms, in the user's own account. FieldOS is not a party to it.

We warn; we don't silently strip.

Before the file is written, a contents summary lists what's inside, and a required checkbox confirms the user understands provider terms.

Plain warning copy at the handoff:

This export is your data, for your own AI account. Check it for customer details and access codes before you paste or upload it — once it leaves FieldOS, the AI provider's terms apply.

No round-trip authority.

Pasting third-party AI text back into FieldOS makes it a user-authored note like any other.

AI in FieldOS, in plain words.

FieldOS's AI can draft a summary, shorten your notes, or translate between English and Spanish - always from text you wrote, always as a draft you read and edit before anyone sees it. It runs only when you tap an AI button, and drafts are limited per day on each plan.

It will never: send anything for you, change your records, judge whether work is safe or up to code, or train on your data. Your photos, customer names, addresses, and gate codes stay out of AI requests.

Prefer your own AI? Export your data anytime and use it in your ChatGPT, Gemini, or Claude account. That file is yours - check it for customer details before you share it, because once it leaves FieldOS, the AI provider's terms apply.

Keep / Defer / Kill

Own cloud AI: draft / summarize / translate (rate-limited, check-before-send)

Available today.

On-device speech-to-text, search, summarize

Available today (preferred path).

Photo pixels to any model

DEFER, explicit per-use opt-in only.

BYO API key in-app

Planned, opt-in only.

AI inspector / AI compliance checker / AI pricing system / always-on assistant / auto-tagging by default

We won't build this.

Net:

FieldOS's AI is two honest things: fenced drafting/translation convenience inside the app, and a clean structured exit ramp to the user's own AI.