Features

Job Photos Today, Field Memory That Compounds

The first screen is capture. The deeper system remembers properties, builds packets, runs the math, and exports everything.

Core features

Before and after photos

The camera ties each shot to the job, property, time, section, and label at capture.

Proof packets

Checked, customer-readable reports with share and PDF paths.

It does the math

32 built-in calculators — wire sizing, leak rate, pay applications, deposits, crew-hour estimates and more — run locally, offline, with the math shown.