Lawn care and landscaping

FieldOS for Lawn Care

Before and after mow proof, property notes, no-access records, and route memory that stays usable with no signal.

Built for recurring stops

Open the property, tap Start Visit, shoot before and after, then send a clean proof packet. Gate, dog, turf, parking, and last-visit notes appear when the crew needs them.

Job-tied camera

Every photo is stamped to property, visit, time, and Before or After at capture.

No-access record

Locked gate or loose dog gets a timestamped note and optional photo before the route moves on.

Restock and route hints

Materials logs and your own stop history feed the restock check, a quick check that your gear is loaded, your usual stop order, and parking and access memory.