Guides

Field Service Guides

How to capture proof, keep property memory, work without signal, and check field math without turning FieldOS into a heavy suite.

Proof and communication

When a customer says the job was not done

Open the property, capture before and after photos inside the visit, add the note that explains what changed, then check a packet before sending. The packet keeps access notes and private owner comments out by default.

Read the job-proof use case

Before and after photos that stay tied to the job

Use the bound camera instead of the camera roll when the photo needs to carry property, visit, time, section, and label context. Imported photos are still marked honestly with the time they were added.

See bound photos

Proof packets clients can open without an account

Check selected photos, notes, materials, checklist rows, scope changes, and the non-certification footer before sharing a hosted link or a PDF file. Recipients install nothing.

Open proof packet feature

Offline work and memory

Working where there is no signal

Capture, voice, notes, packets, calculations, and exports save locally first. Hosted links, team sync, cloud backup, billing, and AI wait for signal instead of blocking the visit.

Read the offline guide

Property notes that show up at the stop

Keep access reminders, parking, pets, hazards, preferences, and last-visit history on the property card. Access reminders are working memory, not permission to enter.

Read the property notes guide

Small crew handoff without live tracking

Shared property memory, assigned stops, owner checks, and exports keep a 2-8 person crew aligned without GPS surveillance or individual-ranking language.

Read the small crew guide

Field math and exports

Field math with receipts

Use the calculators when a field number needs a formula, assumptions, table date, and a saved record. They show the math and never certify the decision.

See the math boundary

Estimate from your own history

Similar-job and crew-hour support are most useful after the app has captured your own visits, materials, durations, and scope notes.

Read estimate-history guide

Export before you rely on another system

Data backup, CSV, PDF, ZIP, and calendar exports keep the account readable after plan changes and make handoff to accounting, calendars, or another tool explicit.

Check security and data